Review process
The NOC team follows three steps to reach a decision.1
Receive the request
The team receives the request and adds it to the review queue. The network status in the Customer Portal shows Pending.
2
Verify the submission
The team checks the network prefix in Classless Inter-Domain Routing (CIDR) notation, autonomous system (AS) number validity, and Letter of Authorization (LOA) document, verifying that all information matches the submission.
3
Make a decision
Approval, rejection, and revocation each trigger an email notification. The portal status changes according to the outcome:
- Approved — portal status changes to Inactive: need info, which unlocks network configuration.
- Rejected — portal status changes to Rejected.
- Revoked — portal status resets to Pending. The recorded AS number and prefixes are removed, and the NOC adds a comment explaining the reason.
Email notifications
An approval email includes the following details:- Confirmation of approval.
- Approved AS number.
- Approved network (CIDR).
- Instructions for the next steps.
Waiting for a decision
While waiting for a decision:- Watch for an approval, rejection, or revocation notification by email, including the spam folder.
- Prepare the Generic Routing Encapsulation (GRE) endpoint IP of the local router.
- Approved — continue with network configuration to apply the protection settings.
- Rejected — review the rejection email, update the CIDR, AS number, or LOA as instructed, and resubmit the network.
- Revoked — review the NOC comment in the revocation email, correct the submission, and resubmit the network.